WCB Covered · Fully Insured(604) 366-4087
    Back to Blog
    Renovation GuidesAJOctober 21, 20265 min read

    Home Renovation Permits in Vancouver and Burnaby: A Homeowner Checklist

    Home Renovation Permits in Vancouver and Burnaby: A Homeowner Checklist
    Quick Answer

    Permit requirements depend on the property address and exact work. Describe proposed layout, structural and building-service changes to the municipality, then ask which building, trade and inspection steps apply before scheduling.

    Permit questions are easiest to resolve when you describe the actual renovation, not just the room name. A kitchen update that keeps its existing layout raises different questions from work that moves walls or building services. Requirements also vary between Vancouver, Burnaby and other municipalities.

    Building permit and trade permit: different questions

    A building permit concerns the proposed building work and the city's review process. Trade permits cover regulated systems and work such as electrical, plumbing or gas. A building permit does not by itself confirm that all required trade permits or inspections are complete. Depending on the project, more than one approval may apply—or a particular approval may not be required. Confirm rather than assume.

    Vancouver lists renovation work involving moved interior walls or existing plumbing, electrical or gas lines among examples where a permit may be required. The city also notes that many small projects and repairs do not require a permit. Its online guidance is a starting point, not a determination for every property.

    Burnaby has separate guidance for home improvement permits and residential trade permits. Review the appropriate sections for your building type and work, then check any project-specific instructions with the city.

    A homeowner decision checklist

    Before requesting a permit determination, write down:

  1. The property's civic address and municipality
  2. The rooms, intended use and proposed finished layout
  3. Whether walls, openings, stairs or structural components will change
  4. Whether plumbing, electrical, gas, heating or ventilation will move or be added
  5. Whether the work affects a secondary suite or shared building systems
  6. Any known previous alterations or permit records
  7. The responsible contractor or trade professionals and any available drawings
  8. Whether the home is strata and what written approval is required
  9. Include sketches or product information if available. The municipality may need additional details before it can advise which applications, documents or inspections apply.

    What to ask the city

    Ask whether a building permit is required for the described work and whether development or other approvals should be checked first. Ask which trade permits and inspections may apply, who may submit each application, and what must be approved before work begins. Keep the response with the project documents and confirm any conditions that change the scope.

    Do not rely on a contractor's general statement, an online example for another address, or a previous permit as proof that the current work is approved. Municipal guidance can change, and the same type of renovation may have different requirements because the property and scope differ. For strata homes, municipal approval does not replace the strata's own alteration process.

    Plan the permit questions with your renovation scope

    Define the work first, then discuss approvals as part of the written project scope. Clarify who is responsible for applications, fees, drawings, inspections and providing access. Do not schedule work on the assumption that an application has been approved.

    For renovation planning, see SturdyBee's kitchen renovation service and documented Burnaby whole-home renovation. That project page records completed work; it is not permit advice or a template for another property.

    To discuss your renovation scope and next steps, contact SturdyBee. Permit requirements should still be confirmed with the municipality and relevant trade authority.

    Official city information

  10. Vancouver: Building permit information and when you need a permit
  11. Burnaby: Home improvement permits
  12. Burnaby: Residential trade permits
  13. Rules and processes can change. Confirm current requirements directly with the municipality responsible for the property and the relevant trade authority. This checklist is general information, not legal or permit advice.

    Ready to get started?

    SturdyBee Property Solutions serves 18 cities across Metro Vancouver & Fraser Valley. WCB covered, fully insured, Google Guaranteed.